Both Heat Recovery Steam Generators are now in the transition phase between Erection and Commissioning. Site looks like this on a sunny day.


In the background on the right side you can also imagine the machine hall and the warm water boilers (three of them) right in front.

The following picture gives you an impression of the natural gas burner of the Aux Boiler in operation. The capacity of the Aux Boiler is over 20 tons of saturated steam per hour what enables a simultaneous start of the two lines of the CCPP.